Nov 28, 2022
Baffling
- (3 hours)
Category: Engine
Continued work on baffling. Fabricated front angle brackets for inlet floor to outer, front side baffles. Drilled bottom flanges of cylinder plates for safety wire. Inserted avex rivets and removed mandrels to allow safety wire to pass thru. Hopefully, this will reduce wear on baffle flange. Test bent first cylinder plates and checked for fit Riveted rear baffles and rear, side baffles together.